Almost there …
Hubby and I took half day.
The house was bustling with activities.
At any one time, there were at least 15 men working.
The air-con fixed.
The window grille fixed. This is our boys’ room. The cabinets under the window almost done. Ah Keong made it strong enough to take the boys’ weigh because we for see that they will climb up there and sit! Bought the shelves from IKEA for them to put their books.

Another photo of their airplane light with energy saving light for the kids’ bedtime.

Toilet accessories for the Master Toilet fixed. However, the workers lost some accessories for the toilet bowl in the common toilet. So cannot fixed. Still waiting for Ah Keong’s cabinet for the 2 toilets, then basins and mirrors can be fixed.
Lights up. But the Electrician not very honest. Made mistake, changed our drawings and claimed that we were the one who requested it to be done that way! Next time must draw in special colour ink!
Main Dining. But most likely we will change to a box design one.

Dining in the Kitchen. More classic look.

Kitchen cabinets up. Still think the colour combi not very nice! We use BLUM for 3 drawers. Love to play with them! 

Platform is also done. Parquet laid. Just need polishing

View from our main door. Looks better if warm lights. These 2 photo taken with white light.


Hand over will not be this week.
Polishing of the marble flooring this Saturday.
Paintings and Touch ups next week.
Should be mid week, next week. Will be shifting in by end next week. YIPEEEEEeeeee!